| 1. | The 233 U zero-power experiments and dynamics tests confirmed the predicted neutronic characteristics.
|
| 2. | Most have been doing their own dynamic tests for years.
|
| 3. | Dynamic tests came in three configurations, one for each phase of Saturn V-powered flight.
|
| 4. | The second test performs an aero-dynamic test on the vehicle.
|
| 5. | After the S-II-T / D destruction, a third article was assigned to dynamic test duties.
|
| 6. | The dynamic test article LTA-2 was refurbished and flown on the next Saturn V launch, Apollo 6.
|
| 7. | Configuration I testing followed in the Saturn V Dynamic Test Stand, then Configuration II in the same place.
|
| 8. | Dynamic tests are much more important,
|
| 9. | A number of other test stands followed, the largest being the Saturn V Dynamic Test Stand completed in 1964.
|
| 10. | Cranking compression is a dynamic test of the actual low-speed pumping action, where peak cylinder pressure is measured and stored.
|